SCR commissions 106 Km of Electric Traction on Vijayawada–Uppaluru–Bhimavaram Section






South Central Railway has completed and commissioned 106 kms of Electric traction of the railway line between Vijayawada–Uppaluru-Bhimavaram sections of Vijayawada Division on 21st January, 2021. The newly commissioned Electrification work of the section includes single line with electric traction from Vijayawada to Uppaluru for a length of 18 kms and double line with electric traction from Uppaluru to Bhimavaram Town for a length of 88 kms. The total length of electric traction in terms of Track Kilometers in the section is 226 kms.

The newly commissioned Electrification project is part of the Vijayawada–Gudivada–Bhimavaram–Narsapur, Gudivada–Machilipatnam & Narsapur–Nidadavolu Doubling and Electrification project of SCR, which is being executed at a cost of Rs.3,000 Crore. With a vision to provide impetus to the development of coastal belt of Andhra Pradesh, Indian Railways took up the doubling and electrification project in the year 2011-12 for a distance of 221 kms. 

The new infrastructure development project will significantly strengthen Rail transport infrastructure for seamless movement of freight and passenger traffic on rails, the new double rail line is bound to serve public aspirations in several ways apart from saving energy and reducing fuel expenditure besides reducing carbon foot print.   

The work has been executed by RVNL (Rail Vikas Nigam Limited) with modern construction practices and technology adoption. Shri Ram Kripal, Commissioner of Railway Safety, South Central Circle conducted inspection of Electric traction between Vijayawada–Uppaluru single line and double line section between Uppaluru–Bhimavaram Town on 19th and 20th January, 2021. He authorized the zone to run the Passenger and Freight trains on the section. 

Shri Gajanan Mallya, General Manager, SCR expressed his happiness at the achievement of the Zone. He complemented the officials for completing the project works as per schedule, overcoming the unexpected impact of COVID-19 pandemic situation. The General Manager opined that the long felt needs of the Coastal Belt of Andhra Pradesh have been fulfilled.

RAILWAY ELECTRIFICATION WORKS OF  VIJAYAWADA-BIMAVARAM TOWN

CRS inspection of VIJAYAWADA TO BHIMAVARAM was completed in two days from 19/1/21-20/1/21  and RE authorization was issued at 1.15 AM  on 21/1/2021 after speed trail & current collection test from 20:30hrs(20/01/2021) to 1:03hrs (21/01/2021)

Highlights of the project:

CRS sanction is given for RE works of following section.

Electrified Section (Br. Line)

RKM

TKM

BZA-GDV

42.690

91.934

GDV -BVRT

63.478

138.778

Total

106.168

230.712

RVNL CARRIED OUT THE WORK THROUGH TWO PACKAGES.

PACKAGE-1: BZA-UPPULURU: 18Kms single line electrification &

UPPULURU-MOTURU: 34kms double line electrification.

PACKAGE-2: MOTURU to BVRT:54KMS DOUBLE LINE ELECTRIFICATION.

Details of Assets created in BZA-BVRT section Railway electrification work:

1

Traction Sub-Stations

04

GDV, BVRT

2

Sectioning & Paralleling Posts

02

NDM, KKLR

3

Sub Sectioning & paralleling Posts

08

MDUN, UPL, IDP, GDV, OTR, MDVL, AKVD, UNDI

4

Supervisory Remote Control

01

BZA

5

Remote Control

01

BZA

6

O H E & PSI Depots

02

GDV